翻訳と辞書
Words near each other
・ Project Superhero
・ Project Superior
・ Project Superpowers
・ Project SuperStar
・ Project Superstar (Malaysia)
・ Project SuperStar (season 1)
・ Project SuperStar (season 2)
・ Project SuperStar (season 3)
・ Project Superstar Malaysia (Season 3)
・ Project Survival
・ Project Sylpheed
・ Project Syndicate
・ Project Talent
・ Project Tango
・ Project team
Project team builder
・ Project Thread
・ Project Tiger
・ Project Timberwind
・ Project TIME
・ Project Titan
・ Project topi
・ Project Torque
・ Project Transformation
・ Project Trillian
・ Project Trio
・ Project Trust
・ Project Tuva
・ Project Twenty1
・ Project Twilight


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Project team builder : ウィキペディア英語版
Project team builder
Project team builder (sometimes abbreviated as PTB) is a project management simulation tool developed for training and teaching the concepts of project management and for improving project decision making. A number of published books and academic papers are based on the PTB and its predecessors. The PTB won the Project Management Institute Professional Development Product of the Year Award.〔Project Management Institute "Project Management Institute Honors The Technion-Israel Institute of Technology", October 20, 2008 ()

The PTB is used in universities and business organizations around the world. The simulator is based on an approach that separates the simulation engine from the scenario editor and allows each user (or instructor) to simulate any project. The simulation engine simulates the dynamic stochastic nature of modern projects.
The design of the PTB supports the system engineering approach to Problem solving as each scenario presents the requirements, the alternatives that can be selected and the constraints imposed on the solution. The user has to trade off the cost, schedule, risk, and benefits to the stake holders and to find a feasible, robust, good solution for the scenario. The solution is then simulated by the simulation engine while the trainee exercises monitoring and control throughout the execution.
A planned project can be simulated using Monte Carlo simulation. This is done in automatic mode (without a human decision maker involved) and shows the probability to finish the project at any time period or at any cost. Furthermore, based on the Monte Carlo simulation the probability of each activity to be on the critical path is estimated (the criticality index). The Monte Carlo analysis supports risk analysis and decision making.
Another characteristic of the simulator is the ability to save points in the history of each run for future analysis or even for testing a different solution from any of the points saved.
== History ==
The simulator was initially developed in the early nineties as the project management trainer at the Technion.
It was used to train students at the Technion and project teams from the Israel Electric Corporation. Based on extensive research on simulation based training the Technion team expanded the PTB to include history mechanisms and a scenario builder with which the trainee can import real project files and simulate these projects.
In 2008 the PTB won the Project Management Institute ''Product of the Year'' award.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Project team builder」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.